Skip to product information
1 of 1

Prinsu

Toyota Sequoia Prinsu Ladder | 2008-2021

Toyota Sequoia Prinsu Ladder | 2008-2021

Regular price $480.00
Regular price Sale price $480.00
Sale Sold out
Shipping calculated at checkout.

Toyota Sequoia Prinsu Ladder. Sold and supported by Offroad Toy Outfitters, a veteran-owned offroad shop in Vancouver, WA. Built to order by Prinsu and shipped to customers nationwide.

Key Features

The Prinsu Toyota Sequoia 2nd Gen Ladder (2008-2021) provides safe, lightweight access to your roof rack and gear, perfect for family adventures and overland setups. Built in the USA from 14-gauge steel, this 17 lb ladder is engineered for strength without unnecessary bulk. Backed by a Limited Lifetime Warranty, it installs securely with a drill-mount system requiring two small holes with plus nuts. Fully compatible with the Sequoia’s roll-down rear window and power lift gate.

Key Features

  • Vehicle Fitment: Toyota Sequoia 2nd Gen (2008-2022, all trims)
  • Strong & Lightweight: 17 lbs with 260 lb load capacity
  • Engineered Materials: 14-gauge steel rungs + 1"x1"x.083" square tubing for durability
  • Secure Footing: Formed steel rungs with a durable surface
  • Modular Design: Adjustable rung placement for customization
  • Corrosion Resistant: 2-stage black powder coat with epoxy zinc primer
  • Installation: Drill system, requires drilling two small holes on the underside of the hatch jamb, plus nuts and full hardware included
  • Slim Profile: No interference with rear camera or rearview visibility
  • Rear Window Compatibility: Works seamlessly with the Sequoia’s roll-down rear window
  • Power Lift Gate: Fully compatible with power lift gate operation
  • Overland Ready: Ideal for rooftop tents and roof-rack gear access
  • Made in the USA:

Fitment & Specifications

Brand Prinsu
Product Line Original Prinsu
Product Type Roof Rack Ladder
Vehicle Fitment Toyota Sequoia
Model Years 2008-2021
Part Number 600-000-000-508

Lead Time

This item is built to order. Current estimated lead time is 4 to 5 weeks from order placement. Lead times are estimates and can shift with manufacturer production volume and material availability. Contact us before ordering if you have a hard deadline for a trip or build.

View full details